Interface: KYEM - KYTC Emergency Services Coordinator

KYEM to KYTC Emergency Services Coordinator Interface Diagram

Architecture Flow Definitions

emergency plan coordination  (Planned)  Applicable ITS Standards

Information that supports coordination of emergency management plans, continuity of operations plans, emergency response and recovery plans, evacuation plans, and other emergency plans between agencies. This includes general plans that are coordinated prior to an incident and shorter duration tactical plans that are prepared during an incident.

emergency traffic control information  (Planned)  Applicable ITS Standards

Status of a special traffic control strategy or system activation implemented in response to an emergency traffic control request, a request for emergency access routes, a request for evacuation, a request to activate closure systems, a request to employ driver information systems to support public safety objectives, or other special requests. Identifies the selected traffic control strategy and system control status.

emergency traffic control request  (Planned)  Applicable ITS Standards

Special request to preempt the current traffic control strategy in effect at one or more signalized intersections or highway segments, activate traffic control and closure systems such as gates and barriers, activate safeguard systems, or use driver information systems. For example, this flow can request all signals to red-flash, request a progression of traffic control preemptions along an emergency vehicle route, request a specific evacuation traffic control plan, request activation of a road closure barrier system, or place a public safety or emergency-related message on a dynamic message sign.

evacuation information  (Planned)  Applicable ITS Standards

Evacuation instructions and information including evacuation zones, evacuation times, and reentry times.

maint and constr resource request  (Planned)  Applicable ITS Standards

Request for road maintenance and construction resources that can be used in the diversion of traffic (cones, portable signs), clearance of a road hazard, repair of ancillary damage, or any other incident response. The request may poll for resource availability or request pre-staging, staging, or immediate dispatch of resources.

maint and constr resource response  (Planned)  Applicable ITS Standards

Current status of maintenance and construction resources including availability and deployment status. General resource inventory information covering vehicles, equipment, materials, and people and specific resource deployment status may be included.

road network status assessment  (Planned)  Applicable ITS Standards

Assessment of damage sustained by the road network including location and extent of the damage, estimate of remaining capacity, required closures, alternate routes, necessary restrictions, and time frame for repair and recovery.