Interface: City of Cleveland TOC - TDOT Region 2 District Operations

City of Cleveland TOC to TDOT Region 2 District Operations Interface Diagram

Architecture Flow Definitions

current asset restrictions  (Planned)  Applicable ITS Standards

Restrictions levied on transportation asset usage based on infrastructure design, surveys, tests, or analyses. This includes standard facility design height, width, and weight restrictions, special restrictions such as spring weight restrictions, and temporary facility restrictions that are imposed during maintenance and construction.

maint and constr work plans  (Planned)  Applicable ITS Standards

Future construction and maintenance work schedules and activities including anticipated closures with anticipated impact to the roadway, alternate routes, anticipated delays, closure times, and durations.

road weather information  (Planned)  Applicable ITS Standards

Road conditions and weather information that are made available by road maintenance operations to other transportation system operators.

work plan coordination  (Planned)  Applicable ITS Standards

Coordination of work plan schedules and activities between maintenance and construction organizations or systems. This information includes the work plan schedules and comments and suggested changes that are exchanged as work plans are coordinated and finalized.

work plan feedback  (Planned)  Applicable ITS Standards

Comments and suggested changes to proposed construction and maintenance work schedules and activities. This information influences work plan schedules so that they minimize impact to other system operations and the overall transportation system.