Interface: TDOT Region 1 TMC - Knoxville - TDOT Ramp Metering Equipment
Information Flow Definitions
roadway dynamic signage data (Planned)
Information used to initialize, configure, and control dynamic message signs. This flow can provide message content and delivery attributes, local message store maintenance requests, control mode commands, status queries, and all other commands and associated parameters that support remote management of these devices.
roadway dynamic signage status (Planned)
Current operating status of dynamic message signs.
traffic detector control (Planned)
Information used to configure and control traffic detector systems such as inductive loop detectors and machine vision sensors.
traffic detector data (Planned)
Raw and/or processed traffic detector data which allows derivation of traffic flow variables (e.g., speed, volume, and density measures) and associated information (e.g., congestion, potential incidents). This flow includes the traffic data and the operational status of the traffic detectors
traffic images (Planned)
High fidelity, real–time traffic images suitable for surveillance monitoring by the operator or for use in machine vision applications. This flow includes the images. Meta data that describes the images is contained in another flow.
traffic metering control (Planned)
Control commands and operating parameters for ramp meters, interchange meters, mainline meters, and other systems equipment associated with roadway metering operations.
traffic metering status (Planned)
Current operational status and operating parameters for ramp meters, interchange meters, mainline meters and other control equipment associated with roadway metering operations.
video surveillance control (Planned)
Information used to configure and control video surveillance systems.