Interface: TDOT Region 1 District Operations - TDOT Maintenance Vehicles

TDOT Region 1 District Operations to TDOT Maintenance Vehicles Interface Diagram

Architecture Flow Definitions

maint and constr vehicle location data  (Planned)  

The current location and related status (e.g., direction and speed) of the maintenance/construction vehicle.

work zone status  (Planned)  

Current work zone status including current location (and future locations for moving work zones), impact to the roadway, required lane shifts, expected time(s) and duration of impact, anticipated delays, alternate routes, and suggested speed limits.

work zone warning status  (Planned)  

Status of a work zone safety monitoring and warning devices. This flow documents system activations and includes additional supporting information (e.g., an image) that allows verification of the alarm.