MCM Data Collection Functional Area

Description

Collection and storage of maintenance and construction information. For use by operations personnel or data archives in the region.

Included In

TDOT Region 1 TMC - Knoxville
City of Morristown TOC

Functional Requirements

IDRequirement
1The center shall collect maintenance and construction data (such as field equipment status, infrastructure status, maintenance and construction activity data) gathered from roadway, traffic, and other maintenance and construction sources.
2The center shall assign quality control metrics and meta-data to be stored along with the data. Meta-data may include attributes that describe the source and quality of the data and the conditions surrounding the collection of the data.
3The center shall receive and respond to requests from ITS Archives for either a catalog of the maintenance and construction data or for the data itself.
4The center shall be able to produce sample products of the data available.
5The center shall provide data to Asset Management to be used in updating the status of assets in the inventory.