Interface: City of Chattanooga Public Works Department - Municipal/State ActiveITS Platform
Information Flow Definitions
equipment maintenance request (Planned)
Identification of field equipment requiring repair and known information about the associated faults.
equipment maintenance status (Planned)
Current status of field equipment maintenance actions.
maint and constr work plans (Planned)
Future construction and maintenance work schedules and activities including anticipated closures with anticipated impact to the roadway, alternate routes, anticipated delays, closure times, and durations.
roadway maintenance status (Planned)
Summary of maintenance fleet operations affecting the road network. This includes the status of winter maintenance (snow plow schedule and current status).
work zone information (Planned)
Summary of maintenance and construction work zone activities affecting the road network including the nature of the maintenance or construction activity, location, impact to the roadway, expected time(s) and duration of impact, anticipated delays, alternate routes, and suggested speed limits. This information may be augmented with images that provide a visual indication of current work zone status and traffic impacts.