Interface: Fort Campbell TOC - Fort Campbell Rail Notification System

Fort Campbell TOC to Fort Campbell Rail Notification System Interface Diagram

Information Flow Definitions

rail crossing control data  (Planned)  

Data required for HRI information transmitted at railroad grade crossings and within railroad operations.

rail crossing request  (Planned)  

A request for highway–rail intersection status or a specific control request intended to modify HRI operation.