Interface: Fort Campbell TOC - Fort Campbell Rail Notification System
Information Flow Definitions
rail crossing control data (Planned)
Data required for HRI information transmitted at railroad grade crossings and within railroad operations.
rail crossing request (Planned)
A request for highway–rail intersection status or a specific control request intended to modify HRI operation.