Home
Project Reports
Inland Empire Home
Stakeholders
Inventory by Stakeholder
Inventory by Entity
Market Packages
Functions
Interfaces

 

CT logo.gif (2502 bytes)
prima.gif (828 bytes)

Interface: Caltrans District Maintenance Dispatch To CHP Dispatch Centers

Caltrans District Maintenance Dispatch to CHP Dispatch Centers Interface Diagram

 

Architecture Flow Definitions

alert notification   (Planned)   Applicable ITS Standards

Notification of a major emergency such as a natural or man-made disaster, civil emergency, or child abduction for distribution to the public. The flow identifies the alert originator, the nature of the emergency, the geographic area affected by the emergency, the effective time period, and information and instructions necessary for the public to respond to the alert. This flow may also identify specific information that should not be released to the public.

 

alert status   (Planned)   Applicable ITS Standards

Information indicating the current status of the emergency alert including identification of the traveler and driver information systems that are being used to provide the alert.

 

incident information   (Planned)   Applicable ITS Standards

Notification of existence of incident and expected severity, location, time and nature of incident. As additional information is gathered and the incident evolves, updated incident information is provided. Incidents include any event that impacts transportation system operation ranging from routine incidents (e.g., disabled vehicle at the side of the road) through large-scale natural or human-caused disasters that involve loss of life, injuries, extensive property damage, and multi-jurisdictional response.

 

maint and constr resource request   (Planned)   Applicable ITS Standards

Request for road maintenance and construction resources that can be used in the diversion of traffic (cones, portable signs), clearance of a road hazard, repair of ancillary damage, or any other incident response. The request may poll for resource availability or request pre-staging, staging, or immediate dispatch of resources.

 

maint and constr resource response   (Planned)   Applicable ITS Standards

Current status of maintenance and construction resources including availability and deployment status. General resource inventory information covering vehicles, equipment, materials, and people and specific resource deployment status may be included.

 

road weather information   (Planned)   Applicable ITS Standards

Road conditions and weather information that are made available by road maintenance operations to other transportation system operators.

 

roadway maintenance status   (Planned)   Applicable ITS Standards

Summary of maintenance fleet operations affecting the road network. This includes the status of winter maintenance (snow plow schedule and current status).

 

For more information regarding this project, contact Bill Tournay at Bill_Tournay@dot.ca.gov

For more information regarding this project's web site, contact Melissa Hewitt at Melissa.Hewitt@kimley-horn.com