Home
Project Reports
Interfaces Home
Stakeholders
Inventory by Stakeholder
Inventory by Entity
Market Packages
Market Packages by Stakeholder
Functions
Interconnects
Interfaces

 

CT logo.gif (2502 bytes)
prima.gif (828 bytes)

Market Packages

One of the first steps in developing an architecture is to identify the transportation services that are important to the region.  This page lists the market packages that are relevant to the state - those market packages that provide statewide or interregional services, building on the Task 5 analysis.  The market packages are listed in market package order so that all similar services are grouped.

Each of the selected market packages was then customized to represent the operational concept for service delivery at the interregional or state level.  The customized market package diagrams are available in PDF format by clicking the market package diagram icons below.

Area Market Package Market Package Name Status
Traffic Management

Link to Traffic Management Market Package Diagrams

ATMS01 Network Surveillance Existing
ATMS02 Probe Surveillance Not Planned
ATMS03 Surface Street Control Not Planned
ATMS04 Freeway Control Existing
ATMS05 HOV Lane Management Not Planned
ATMS06 Traffic Information Dissemination Existing
ATMS07 Regional Traffic Control Existing
ATMS08 Traffic Incident Management System Existing
ATMS09 Traffic Forecast and Demand Management Not Planned
ATMS10 Electronic Toll Collection Existing
ATMS11 Emissions Monitoring and Management Not Planned
ATMS12 Virtual TMC and Smart Probe Data Not Planned
ATMS13 Standard Railroad Grade Crossing Not Planned
ATMS14 Advanced Railroad Grade Crossing Not Planned
ATMS15 Railroad Operations Coordination Planned
ATMS16 Parking Facility Management Not Planned
ATMS17 Regional Parking Management Not Planned
ATMS18 Reversible Lane Management Not Planned
ATMS19 Speed Monitoring Not Planned
ATMS20 Drawbridge Management Not Planned
ATMS21 Roadway Closure Management Planned
Maintenance and Construction

Link to Maintenance and Construction Market Package Diagrams

MC01 Maintenance and Construction Vehicle and Equipment Tracking Planned
MC02 Maintenance and Construction Vehicle Maintenance Not Planned
MC03 Road Weather Data Collection Existing
MC04 Weather Information Processing and Distribution Existing
MC05 Roadway Automated Treatment Not Planned
MC06 Winter Maintenance Existing
MC07 Roadway Maintenance and Construction Planned
MC08 Work Zone Management Planned
MC09 Work Zone Safety Monitoring Not Planned
MC10 Maintenance and Construction Activity Coordination Planned
Public Transportation

Link to Public Transportation Market Package Diagrams

APTS1 Transit Vehicle Tracking Not Planned
APTS2 Transit Fixed-Route Operations Not Planned
APTS3 Demand Response Transit Operations Not Planned
APTS4 Transit Passenger and Fare Management Existing
APTS5 Transit Security Not Planned
APTS6 Transit Maintenance Not Planned
APTS7 Multi-modal Coordination Planned
APTS8 Transit Traveler Information Planned
Traveler Information

Link to Traveler Information Market Package Diagrams

ATIS1 Broadcast Traveler Information Existing
ATIS2 Interactive Traveler Information Existing
ATIS3 Autonomous Route Guidance Not Planned
ATIS4 Dynamic Route Guidance Not Planned
ATIS5 ISP Based Route Guidance Not Planned
ATIS6 Integrated Transportation Management/Route Guidance Not Planned
ATIS7 Yellow Pages and Reservation Not Planned
ATIS8 Dynamic Ridesharing Not Planned
ATIS9 In Vehicle Signing Not Planned
Commercial Vehicle Operations

Link to Commercial Vehicle Operations Market Package Diagrams

CVO01 Fleet Administration Not Planned
CVO02 Freight Administration Planned
CVO03 Electronic Clearance Planned
CVO04 CV Administrative Processes Planned
CVO05 International Border Electronic Clearance Planned
CVO06 Weigh-In-Motion Planned
CVO07 Roadside CVO Safety Planned
CVO08 On-board CVO and Freight Safety and Security Planned
CVO09 CVO Fleet Maintenance Not Planned
CVO10 HAZMAT Management Planned
CVO11 Roadside HAZMAT Security Detection and Mitigation Planned
CVO12 CV Driver Security Authentication Not Planned
CVO13 Freight Assignment Tracking Not Planned
Emergency Management

Link to Emergency Management Market Package Diagrams

EM01 Emergency Call-Taking and Dispatch Not Planned
EM02 Emergency Routing Not Planned
EM03 Mayday Support Not Planned
EM04 Roadway Service Patrols Not Planned
EM05 Transportation Infrastructure Protection Existing
EM06 Wide-Area Alert Existing
EM07 Early Warning System Planned
EM08 Disaster Response and Recovery Planned
EM09 Evacuation and Reentry Management Planned
EM10 Disaster Traveler Information Planned
Archived Data Management

Link to Archived Data Management Market Package Diagrams

AD1 ITS Data Mart Existing
AD2 ITS Data Warehouse Not Planned
AD3 ITS Virtual Data Warehouse Not Planned
Vehicle Safety Systems AVSS01 Vehicle Safety Monitoring Not Planned
AVSS02 Driver Safety Monitoring Not Planned
AVSS03 Longitudinal Safety Warning Not Planned
AVSS04 Lateral Safety Warning Not Planned
AVSS05 Intersection Safety Warning Not Planned
AVSS06 Pre-Crash Restraint Deployment Not Planned
AVSS07 Driver Visibility Improvement Not Planned
AVSS08 Advanced Vehicle Longitudinal Control Not Planned
AVSS09 Advanced Vehicle Lateral Control Not Planned
AVSS10 Intersection Collision Avoidance Not Planned
AVSS11 Automated Highway System Not Planned

For more information regarding this project, contact Bill Tournay at Bill_Tournay@dot.ca.gov

For more information regarding this project's web site, contact Melissa Hewitt at Melissa.Hewitt@kimley-horn.com